01 / OFMP KNOWLEDGE LAYER

EQUIPMENT DISCOVERY

Start with the decision fields.

A category is useful only when it helps a buyer express fit, constraints, unknowns, and evidence. OFMP organizes equipment around the procurement decision — not a product-card count.

06priority decision families in the public MVP
01
Pressure control / surface

Wellhead & Christmas Tree

Structure pressure, material, temperature, product specification level, and sour-service requirements before supplier discovery.

REQUIREMENT FIELDS
  • Working pressure
  • Material class
  • Temperature class
  • PSL / PR
REFERENCE CONTEXTAPI 6ANACE MR0175 / ISO 15156
02
Drilling / safety critical

Well Control Equipment

Build an auditable requirement for BOP stacks, choke and kill equipment, and related pressure-control systems.

REQUIREMENT FIELDS
  • Bore size
  • Rated working pressure
  • Temperature rating
  • Control system
REFERENCE CONTEXTAPI 16AAPI 16C
03
Casing / tubing / line pipe

OCTG & Connections

Compare grades, dimensions, connections, collapse and burst requirements without losing the original unit or source.

REQUIREMENT FIELDS
  • Grade
  • OD and weight
  • Connection
  • Service environment
REFERENCE CONTEXTAPI 5CTAPI 5L
04
Drilling / intervention

Drillstring & Downhole Tools

Translate operating envelope, formation, trajectory, and interface constraints into a supplier-ready technical brief.

REQUIREMENT FIELDS
  • Tool type
  • Connection
  • Operating envelope
  • Formation / trajectory
REFERENCE CONTEXTAPI 7-1API 7-2
05
Production / process

Valves, Pumps & Artificial Lift

Discover compatible equipment by fluid, duty point, materials, actuation, lifecycle, and regional support needs.

REQUIREMENT FIELDS
  • Fluid and composition
  • Duty point
  • Materials
  • Actuation / power
REFERENCE CONTEXTAPI 6DAPI 610API 11B
06
Installation / lifecycle

Field Services & Integrated Solutions

Qualify service coverage, technical scope, response model, and evidence alongside the equipment shortlist.

REQUIREMENT FIELDS
  • Site location
  • Scope of work
  • Response time
  • Personnel / tooling
REFERENCE CONTEXTProject-specificSupplier quality plan
HAVE A REQUIREMENT?

Let the requirement choose the category.

Ask OFMP